Browse 86 real projects from 5 verified, vetted brands, and learn what challenges other project owners faced at the start, who they contacted for help, how they solved those challenges, and how the finished facility turned out. You can filter by sport, facility type, location and product category. Every case study links to the brand behind the work, where you can get in touch.
No case studies match these filters. Choose "All" or clear the filters to see everything.
~70 fc vertical at the net (modelled) and 50 fc horizontal light.
~140 fc vertical light at the camera side and 100 fc horizontal light.
100 fc vertical light at the camera side and 50 fc horizontal light.
4 poles and 50 fc average maintained light.
~45 fc average maintained light and 1.4:1 uniformity.
45 fc average light on the paddle courts and 1.4:1 uniformity on the paddle courts.
75 fc horizontal light on the football field and 100 fc vertical light at the camera side.
0 service calls in 3 years and 45 fc average maintained light.
50 fc average light on the tennis courts and 45 fc average light on the pickleball courts.
45 fc average maintained light and 1.3:1 uniformity.
50 fc average light on the tennis courts and 45 fc average light on the pickleball courts.
22 fc along the tee line and 1.5:1 uniformity.
20 fc at 50 yards and 6 fc at 250 yards.
50 fc average maintained light and 1.2:1 uniformity.
45 fc average maintained light and 1.4:1 uniformity.
50 fc average maintained light and 1.2:1 uniformity.
50 fc average maintained light and 1.3:1 uniformity.
70 fc on the ice surface and 1.2:1 uniformity.
50 fc average light on the outdoor courts and 56 fc average light on the indoor courts.
3 preset scenes and 28 fc average light on the pitch.
49 fc average maintained light and 1.25:1 uniformity.
50 fc horizontal light and 30 fc vertical light at the rim.
45 fc average maintained light and 1.2:1 uniformity.
45 fc average maintained light and 1.3:1 uniformity.
50 fc on every court and 1.3:1 uniformity.
45 fc average maintained light and 1.3:1 uniformity.
50 fc average light on the infield and 30 fc average light on the outfield.
75 fc average maintained light and under 5 years service life of the old fixtures.
50 fc average light on the tennis courts and 45 fc average light on the pickleball courts.
1 day to retrofit and <90 min per pole.
50 fc average maintained light and 1.4:1 uniformity.
30 fc pitch light in soccer mode and 50 fc court light in tennis mode.
50 fc horizontal light in broadcast mode and 100 fc vertical light in broadcast mode.
45 fc average maintained light and 1.3:1 uniformity.
50 fc average light on the infield and 30 fc average light on the outfield.
49 fc average maintained light and 1.2:1 uniformity.
16 locations lit in two years and 1,700+ fixtures supplied.
65% less energy use and $11,040 saved per year on energy.
34 fc average light and 48 LED flood lights.
39 locations supplied and 65-75 fc at the sample sites shown.
91 fc average light on four courts and 47 fixtures supplied.
98 fc average light across 38 courts and 158 LED high bays.
45 LED lights and 2 fc average on the Blue Line slopes.
30 fc average light across the pool area and 13 LED high bays, one for one.
65.2% energy savings and $24,240 saved per year.
21 fc average light and 12 old 1,000 W fixtures replaced.
7 fc average light, up from about 1 fc and 4 existing poles reused.
101 LED flood lights supplied and 44 / 48 fc infield light, left / right field.
30,000 sq ft of MVP flooring.
130,000+ sq ft of Bio-Channel Classic and 9 basketball courts.
2 gyms replaced and 6,000 sq ft of new flooring.
7,000 sq ft of new gym floor and $100,000 donor gift, matched by Dave Cowens.
53,000 sq ft fieldhouse and 200 yd Durathon Elite track.
10,000 sq ft of MVP maple and 3,000 sq ft of Pulastic Pro 165.
20,000 sq ft of flooring and 2 full-size courts.
126,800 sq ft of Robbins flooring and 512,000 sq ft facility.
$47M arena renovation and 167,000 sq ft facility.
7,000 sq ft of floor and 250+ logo stencils.
27,770 sq ft in the final phase and ~$50M total expansion.
12,400 sq ft of maple flooring and 10-year-old vinyl floor replaced.
6,000 sq ft of retractable floor and 23 m pool beneath the floor.
30,000 sq ft of new floor and 17 graduation ceremonies hosted.
26,000+ sq ft of new floor and 6 competition volleyball courts.
30,000+ sq ft of Robbins surfaces and 4 regulation courts.
FIFA certified field.
2.25 in pile height and 50 oz face weight.
4 synthetic turf fields, 2 baseball and 2 softball and 54 oz face weight.
6 lanes new oval track, plus an 8-lane straightaway and 100+ yrs age of the stadium.
84,000 sq ft indoor practice facility.
52 oz face weight and 2 in pile height.
42 oz face weight and 2.5 in pile height.
1M+ sq ft of synthetic turf and 9 new fields: 4 baseball, 5 multipurpose.
50 oz face weight and 2.25 in pile height.
40 oz face weight and 2.25 in pile height.
2 new turf fields and <5 weeks construction time.
12 hrs install window on the show and 1 backyard basketball court.
1 portable pickleball court and 2-color pre-painted VersaCourt surface.
15,000 sq ft play yard converted and 5 days from start to finished field.
56,470 sq ft field and 4 weeks to complete.
82,500 sq ft field converted and 6 days to convert the field.
2006 year Ultra Base first laid sport tiles over its panels and 2 fabric layers: under and over the panels.
1 former junkyard converted and Soccer turf field for all ages.
1 spring training field converted and 2 fields with matching synthetic turf.
7,200 sq ft field covered with new turf and 1 weekend to complete.
Every brand is a verified business with confirmed contact details and industry credentials, and is part of the SVC professional network. All brands are partners with a commercial agreement with Sports Venue Calculator, which does not affect the order of case studies. Case studies appear in random order, are written by Sports Venue Calculator from the information brands provide and publish, and link to their original source. Read how we vet brands.
Find and take control of any Listings you have on our platform. No Listing to Claim? Click here to add one.
Sending message to
—
What are you planning?
Tell us what you are planning. Be specific to help the supplier understand your project’s situation.
Where is the project at?
Three quick taps. This helps the supplier respond with the right level of detail. All optional.
Your contact details
So we can connect you with the right supplier.
Message sent!
Thanks — we’ll review your enquiry and connect you with the right supplier shortly.